Hi MM experts,
n IPO Release strategy, it is configured like this. Release indicator Y is blocked with changeable indicator 4 and Release indicator Z is Released with changeable indicator 6.
One PO is created, released, and outputted (print through ME9F).
Now user is changing the PO in the qty field; it is increased (10 EA to 15 EA). New release is not triggering. As per the changeable indicator 6; it should trigger new release strategy; Its not triggering.
pl help, Thanks in advance
Regards
Subbu